The construction of a photovoltaic park with 5MW capacity, in Calarasi County.
The construction of a 750.000 mp photovoltaic park with 2.5MWp capacity, in Brasov County.
The construction of a 750.000 mp photovoltaic park with 2.5MWp capacity, in Tulcea County.
The construction of a modern cogeneration plant with a total area of around 7,000 sq. m and a power generation of up to 21 MW…
Logistics Park Phase I – 16,000 sq m including complete infrastructure for the entire 55,000 sq m Logistics Park
City Point is located at 52-70 Avionului Street, District 1, Bucharest, on land with an approximate surface of 124.600 sq m of which construction occupies…
Energy Performance Certification for Banu Antonache business center located in Bucharest.