Cable transport installation

Description

Project Monitoring services for the construction of a cable transport installation in Sinaia – at 1400 m altitude, along with cable transport installation section 1400 – 2000, Chairlift – 1400 m altitude and Chairlift Dorului Valley.

Client:

Location:

Sinaia

Completion Date

2018

Sectors:

Industrial & Logistics